Ventnor City Bayside Outfall Replacement
Sector: Water Supply and Storage • Location: Ventnor City, New Jersey, United States of America
Source: Dodge
Replace the existing stormwater outfalls located in the bayside bulkhead on Portland Avenue. The existing stormwater outfalls consist of two 6-inch square penetrations in the bulkhead. The penetrations are located at the elevation of the roadway, where they allow stormwater that is collected along the curb line to flow directly out the bulkhead. The application is seeking authorization to permit o
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replace the existing stormwater outfalls located in the bayside bulkhead on Portland Avenue. The existing stormwater outfalls consist of two 6-inch square penetrations in the bulkhead. The penetrations are located at the elevation of the roadway, where they allow stormwater that is collected along the curb line to flow directly out the bulkhead. The application is seeking authorization to permit one 24-inch diameter stormwater outfall pipe through the bulkhead. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
