Ventos do Sul
Sector: Commercial • Location: Brazil
Source: World Bank Group
In 2005, Ventos Do Sul Energia SA started to develop a 150 MW wind farm project in Osorio, in the state of Rio Grande do Sul. The greenfield project was the largest wind power project in Latin America and consisted of three 50MW sites, each with 25 turbines of 2MW each. The project had a 20 year power purchase contract with federal utility Eletrobras through Financial Support Program for Investmen
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Wind, Raw Materials, Power Transmission, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ventos do Sul
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2005, Ventos Do Sul Energia SA started to develop a 150 MW wind farm project in Osorio, in the state of Rio Grande do Sul. The greenfield project was the largest wind power project in Latin America and consisted of three 50MW sites, each with 25 turbines of 2MW each. The project had a 20 year power purchase contract with federal utility Eletrobras through Financial Support Program for Investments in Alternative Sources of Electric Energy (PROINFA). Ventos do Sul Energia SA was owned by Spanish Elecnor (64%) throught its subsidiary Enerfin Enervento, German Enercon through its subsidiary Wobben Windpower Brasil, and CIP Brasil. Wobben Windpower Brasil was the equipment supplier. The project cost was estimated at US$296.5 million (793.1 million real). The project reached financial closure on October 2005 when it obtained a US$206.5 million 12-year financing package from a banking consortium led by Banco Nacional de Desenvolvimiento Economico e Social (BNDES). BNDES provided a direct facility of US$46.5 million (105 million real) and a US$160 million (360 million real) covered tranche. The covered tranche was funded by consortium comprising Banco do Brasil (US$44.3 million), Santander, ABN Amro Real, Banrisul and BRDE Caixa do Rio Grande do Sul. BNDES funding was also part of the PROINFA initiative. The sites were expected to begin producing in June, September and December of 2006. The units started operating in December 2006. As of December 2009, the ownership structure of Ventos do Sul had changed and was set as follows: Enercon (9%) and Elecnor (91%). |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Wind, Raw Materials, Power Transmission, Government |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
