Venture Church
Construction documents · Washington · Last reported Nov 2024
Source: Dodge USA
The proposed expansion includes: A 1,510-square-foot balcony in the sanctuary with 224 additional seats A two-story office/classroom space totaling 2,400 square feet A second two-story classroom building totaling 5,740 square feet Additionally, the project proposes a new right-turn-only exit lane onto 35th Avenue Southeast from the church parking lot.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Commercial, Car parking, Road, Automotive
- Location
- Mill Creek, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Venture Church
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed expansion includes: A 1,510-square-foot balcony in the sanctuary with 224 additional seats A two-story office/classroom space totaling 2,400 square feet A second two-story classroom building totaling 5,740 square feet Additionally, the project proposes a new right-turn-only exit lane onto 35th Avenue Southeast from the church parking lot. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mill Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial, Car parking, Road, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
