Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project
Sector: Commercial • Location: LA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration Department of Energy, Office of Fossil Energy Department of the Army, US Army Corps of Engineers - Regulatory Description: This project consists of two proposals: Venture Global Calcasieu Pass Terminal (Docket No. CP15-550-000) and TransCameron Pipeline (Docket Nos. CP15-551-000
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration Department of Energy, Office of Fossil Energy Department of the Army, US Army Corps of Engineers - Regulatory Description: This project consists of two proposals: Venture Global Calcasieu Pass Terminal (Docket No. CP15-550-000) and TransCameron Pipeline (Docket Nos. CP15-551-000 and CP15-551-001). The project consists of: (1) the addition of 1.4 Bcf/d through construction of a new LNG export terminal in Louisiana; and (2) construction of a 23.4-mile-long natural gas pipeline and associated meter station in Louisiana, to provide 1.9 Bcf/d of natural gas transportation service at the LNG terminal for export. Project Application and Supporting Documents Project Application, Volume I, Part 1, FERC Docket Nos. CP15-550-000 and CP15-551-000 (submitted 09/04/2015). Document located at: http://elibrary.ferc.gov/IDMWS/common/OpenNat.asp?fileID=13980067. Supporting Documents to Project Application, FERC Docket Nos. CP15-550-000 and CP15-551-000 (submitted 09/04/2015). Documents located at: http://elibrary.ferc.gov/IDMWS/search/intermediate.asp?link_file=yes&doclist=14374586. Amendment to Project Application, FERC Docket No. CP15-551-001 (submitted 06/28/2016). Document located at: http://elibrary.ferc.gov/IDMWS/common/opennat.asp?fileID=14291642. Additional Project-related filings and issuances can be found on FERC’s eLibrary website by searching under Docket Nos. CP15-550 and CP15-551. Federal Agency Actions The U.S. Coast Guard signed a Letter of Recommendation on January 6, 2016. Federal Energy Regulatory Commission, Notice of Schedule for Environmental Review of the Project (issued 11/29/2017). Document located at: https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=14765973. Federal Energy Regulatory Commission, Notice of Revised Schedule for Environmental Review of the Project (issued 5/18/18). Document located at: http://elibrary.ferc.gov:0/idmws/file_list.asp?document_id=14671894. Federal Energy Regulatory Commission, Draft Environmental Impact Statement (issued 06/22/2018). Document available at: https://www.ferc.gov/draft-environmental-impact-statement-calcasieu-pass-lng-project. Federal Energy Regulatory Commission, Notice of Anticipated Schedule of Final Order for the Project (issued 08/31/2018). Document located at: https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=15013582. Federal Energy Regulatory Commission, Final Environmental Impact Statement (issued 10/22/2018). Document available at: https://cms.ferc.gov/final-environmental-impact-statement-calcasieu-pass-lng-project. Federal Energy Regulatory Commission, Order Granting Authorizations under Sections 3 and 7 of the Natural Gas Act (issued 2/21/2019). Document located at: https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=15166075. FERC Litigation None filed. State Agency Permitting Timetable for Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project Responsible State Agency Federal Permit/Review Intermediate Completion Date Final Completion Date Description Field Louisiana Department of Natural Resources, Office of Coastal Management Section 307 CZMA Review N/A TBD The state agency has not opted into the FAST-41 process. This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. 18 C.F.R. § 157.22 (2016) provides that "a final decision on a request for a Federal authorization is due no later than 90 days after the Commission issues its final environmental document, unless a schedule is otherwise established by Federal law." Louisiana Department of Environmental Quality, Water Permits Division Section 401 CWA Review - Water Quality Certification N/A TBD The state agency has not opted into the FAST-41 process. This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. Water quality certification issued within 90 days after application is determined to be administratively complete. Louisiana Department of Environmental Quality, Water Permits Division Section 402 CWA Review - National Pollutant Discharge Elimination System, Stormwater General Permit N/A TBD The state agency has not opted into the FAST-41 process. This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. Per state regulations, the Louisiana Department of Environmental Quality (LDEQ) has 300 days from receipt of an application to review and issue a water discharge permit. LDEQ follows the 300 day timetable for review and issuance of water discharge permits. Louisiana Department of Environmental Quality, Water Permits Division Section 402 CWA Review - National Pollutant Discharge Elimination System, Industrial Wastewater Discharge Permit N/A TBD The state agency has not opted into the FAST-41 process. This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. Per state regulations, the Louisiana Department of Environmental Quality (LDEQ) has 300 days from receipt of an application to review and issue a water discharge permit. LDEQ follows the 300 day timetable for review and issuance of water discharge permits. Louisiana Department of Environmental Quality, Water Permits Division Section 402 CWA Review - National Pollutant Discharge Elimination System, Hydrostatic Test Discharge Permit N/A TBD The state agency has not opted into the FAST-41 process. This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. Per state regulations, the Louisiana Department of Environmental Quality (LDEQ) has 300 days from receipt of an application to review and issue a water discharge permit. LDEQ follows the 300 day timetable for review and issuance of water discharge permits. Louisiana Department of Environmental Quality, Air Permits Division Title V CAA Review - Operating Permit for Air Emissions N/A TBD The state agency has not opted into the FAST-41 process. This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. 18 C.F.R. § 157.22 (2016) provides that "a final decision on a request for a Federal authorization is due no later than 90 days after the Commission issues its final environmental document, unless a schedule is otherwise established by Federal law." Last updated March 7, 2019 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
