Close

Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration Department of Energy, Office of Fossil Energy Department of the Army, US Army Corps of Engineers - Regulatory Description: This project consists of two proposals:  Venture Global Calcasieu Pass Terminal (Docket No. CP15-550-000) and TransCameron Pipeline (Docket Nos. CP15-551-000

Project Information FAQ

Project Information

4 Q
The project “Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project” is an infrastructure initiative in the Commercial sector, located in LA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: Department of Commerce, National Oceanic and Atmospheric Administration Department of Energy, Office of Fossil Energy Department of the Army, US Army Corps of Engineers - Regulatory Description: This project consists of two proposals:  Venture Global Calcasieu Pass Terminal (Docket No. CP15-550-000) and TransCameron Pipeline (Docket Nos. CP15-551-000 and CP15-551-001).  The project consists of:  (1) the addition of 1.4 Bcf/d through construction of a new LNG export terminal in Louisiana; and (2) construction of a 23.4-mile-long natural gas pipeline and associated meter station in Louisiana, to provide 1.9 Bcf/d of natural gas transportation service at the LNG terminal for export. Project Application and Supporting Documents Project Application, Volume I, Part 1, FERC Docket Nos. CP15-550-000 and CP15-551-000 (submitted 09/04/2015).  Document located at:  http://elibrary.ferc.gov/IDMWS/common/OpenNat.asp?fileID=13980067. Supporting Documents to Project Application, FERC Docket Nos. CP15-550-000 and CP15-551-000 (submitted 09/04/2015).  Documents located at:  http://elibrary.ferc.gov/IDMWS/search/intermediate.asp?link_file=yes&doclist=14374586. Amendment to Project Application, FERC Docket No. CP15-551-001 (submitted 06/28/2016).  Document located at:  http://elibrary.ferc.gov/IDMWS/common/opennat.asp?fileID=14291642. Additional Project-related filings and issuances can be found on FERC’s eLibrary website by searching under Docket Nos. CP15-550 and CP15-551. Federal Agency Actions The U.S. Coast Guard signed a Letter of Recommendation on January 6, 2016.    Federal Energy Regulatory Commission, Notice of Schedule for Environmental Review of the Project (issued 11/29/2017).  Document located at:  https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=14765973. Federal Energy Regulatory Commission, Notice of Revised Schedule for Environmental Review of the Project (issued 5/18/18).  Document located at:  http://elibrary.ferc.gov:0/idmws/file_list.asp?document_id=14671894. Federal Energy Regulatory Commission, Draft Environmental Impact Statement (issued 06/22/2018).  Document available at:  https://www.ferc.gov/draft-environmental-impact-statement-calcasieu-pass-lng-project.   Federal Energy Regulatory Commission, Notice of Anticipated Schedule of Final Order for the Project (issued 08/31/2018).  Document located at:  https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=15013582. Federal Energy Regulatory Commission, Final Environmental Impact Statement (issued 10/22/2018).  Document available at:  https://cms.ferc.gov/final-environmental-impact-statement-calcasieu-pass-lng-project. Federal Energy Regulatory Commission, Order Granting Authorizations under Sections 3 and 7 of the Natural Gas Act (issued 2/21/2019).  Document located at:  https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=15166075. FERC Litigation None filed.    State Agency Permitting Timetable for Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project  Responsible State Agency Federal Permit/Review Intermediate Completion Date Final Completion Date Description Field Louisiana Department of Natural Resources, Office of Coastal Management Section 307 CZMA Review N/A TBD The state agency has not opted into the FAST-41 process.  This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. 18 C.F.R. § 157.22 (2016) provides that "a final decision on a request for a Federal authorization is due no later than 90 days after the Commission issues its final environmental document, unless a schedule is otherwise established by Federal law." Louisiana Department of Environmental Quality, Water Permits Division Section 401 CWA Review - Water Quality Certification N/A TBD The state agency has not opted into the FAST-41 process.  This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable.  Water quality certification issued within 90 days after application is determined to be administratively complete. Louisiana Department of Environmental Quality, Water Permits Division Section 402 CWA Review - National Pollutant Discharge Elimination System, Stormwater General Permit N/A TBD The state agency has not opted into the FAST-41 process.  This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable.  Per state regulations, the Louisiana Department of Environmental Quality (LDEQ) has 300 days from receipt of an application to review and issue a water discharge permit.  LDEQ follows the 300 day timetable for review and issuance of water discharge permits. Louisiana Department of Environmental Quality, Water Permits Division Section 402 CWA Review - National Pollutant Discharge Elimination System, Industrial Wastewater Discharge Permit N/A TBD The state agency has not opted into the FAST-41 process.  This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable.  Per state regulations, the Louisiana Department of Environmental Quality (LDEQ) has 300 days from receipt of an application to review and issue a water discharge permit.  LDEQ follows the 300 day timetable for review and issuance of water discharge permits. Louisiana Department of Environmental Quality, Water Permits Division Section 402 CWA Review - National Pollutant Discharge Elimination System, Hydrostatic Test Discharge Permit N/A TBD The state agency has not opted into the FAST-41 process.  This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable.  Per state regulations, the Louisiana Department of Environmental Quality (LDEQ) has 300 days from receipt of an application to review and issue a water discharge permit.  LDEQ follows the 300 day timetable for review and issuance of water discharge permits. Louisiana Department of Environmental Quality, Air Permits Division Title V CAA Review - Operating Permit for Air Emissions N/A TBD The state agency has not opted into the FAST-41 process.  This authorization is listed for information purposes only, and does not transfer any responsibility to the state agency to conform to the Permitting Timetable. 18 C.F.R. § 157.22 (2016) provides that "a final decision on a request for a Federal authorization is due no later than 90 days after the Commission issues its final environmental document, unless a schedule is otherwise established by Federal law."     Last updated March 7, 2019

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data