logo

Verbund Canakkale-Mahmudiye Wind Farm

Sector: Hydro • Location: Canakkale, Turkey

Source: World Bank Group

Project
Active

Enerjisa was planning the development of the 30 MW Canakkale wind farm. The project was designed to comprise 13 turbines of 2.3 MW, producing an annual 85 GWh. Enerjisa was a 50-50 joint venture between Turkish Sabanci Group and Austria's Verbund. The Sabanci family was Sabanci Holding’s major shareholder (60.6%). The remaining shares (39.4%) were traded on the Istanbul Stock Exchange, which inclu

Status
Prospective
Sector
Hydro, Wind, Government, Power Generation (CCGT), Raw Materials, Commercial
Location
Canakkale, Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Verbund Canakkale-Mahmudiye Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Verbund Canakkale-Mahmudiye Wind Farm” is an infrastructure initiative in the Hydro sector, located in Canakkale, Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Enerjisa was planning the development of the 30 MW Canakkale wind farm. The project was designed to comprise 13 turbines of 2.3 MW, producing an annual 85 GWh. Enerjisa was a 50-50 joint venture between Turkish Sabanci Group and Austria's Verbund. The Sabanci family was Sabanci Holding’s major shareholder (60.6%). The remaining shares (39.4%) were traded on the Istanbul Stock Exchange, which included 9.858% shares held by other family members previously registered to ISE. Verbund International GMBH was a wholly-owned subsidiary of VERBUND AG, and publicly traded on the Vienna Stock Exchange. The Austrian government held 51% of the shares. About 25% of the shares were held by the provincial energy suppliers TIWAG (5%), Wiener Stadtwerke Holding (10%) and EVN (10%). The remaining shares (24%) were free float. The project was commissioned in February 2011. Equipment was supplied by Siemens, including adelivery, installation and commissionings agreement for the turbines, part of the civil works, and a 12 year service and maintenance contract with Siemens. The project company held a 49 year production license for the farm. The Canakkale-Mahmudiye wind farm was the first of four wind farms under development by Enerjisa with a total capacity of 150 MW. Total investment costs was estimated at EUR37 million ($49.2 million). As of October 2011, no further details about the financial structure was available. In 2012, E.ON acquired Verbund's shares in Enerjisa in return for 8 run-of-river hydropower projects totalling 351MW in Germany as well as EUR300 million in cash payments. The swap was expected to be finalized in the first quarter of 2013 after approval from the European Commission.

Original sector

Energy

Budget

Location

Country

Turkey

State

Canakkale

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Government, Power Generation (CCGT), Raw Materials, Commercial

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project