logo
ProjectFinanced

VERBUND STYRIA HV TRANSMISSION TEN

The status, timeline and source of this project. A free account opens every field.

Source: European Investment Bank (EIB)

The project concerns the construction and operation of a 98km 380kV high voltage electricity line between Burgenland and Graz. It has been identified as priority TEN-e project of European interest.

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Government
Location
Austria
Updated
19 Nov 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about VERBUND STYRIA HV TRANSMISSION TEN

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “VERBUND STYRIA HV TRANSMISSION TEN” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Austria. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

financed

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project concerns the construction and operation of a 98km 380kV high voltage electricity line between Burgenland and Graz. It has been identified as priority TEN-e project of European interest.

Original sector

Energy

Budget

Location

Country

Austria

Source

Source reliability

High

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Government

Article published date

2023-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project