logo

Verde 4A Small Hydro Power Plant

Sector: Commercial • Location: Mato Grosso, Brazil

Source: World Bank Group

Project
Active

In May 2005, the Brazilian company DM Construtora de Obras Ltda was granted the 30-year contract to build and operate the Verde 4A Small Hydro Power Plant (28 MW) located at the municipalities of Ribas do Rio Pardo and Agua Clara, state of Mato Grosso (Verde River). The power plant was named PCH Verde 4A.

In June 2014, DM Construtora de Obras sold 100% of its shares to Phoenix Geracao de Energia.

Status
Prospective
Sector
Commercial, Water Supply and Storage, Government, Hydro, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Mato Grosso, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Verde 4A Small Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Verde 4A Small Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Mato Grosso, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2005, the Brazilian company DM Construtora de Obras Ltda was granted the 30-year contract to build and operate the Verde 4A Small Hydro Power Plant (28 MW) located at the municipalities of Ribas do Rio Pardo and Agua Clara, state of Mato Grosso (Verde River). The power plant was named PCH Verde 4A. In June 2014, DM Construtora de Obras sold 100% of its shares to Phoenix Geracao de Energia. In February 2015, Phoenix Geracao de Energia sold 100% of its shares to Perola Energetica S.A, a subsidiary of Brookfield Energias Renovaveis. In April 2015, the company had been granted power purchase agreements to sell electricity to distribution companies starting in 2020. The company presented a winning bid of US$ 61.9/MWh (BRL 206.49/MWh). The investment committed to the power plant was estimated at US$ 80.3 million (BRL 268 million). Construction works commenced in August 2015 and were in its final stages as of June 2017. Financing information was not available. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

State

Mato Grosso

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Government, Hydro, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project