logo

Verde 4A Small Hydro Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In May 2005, the Brazilian company DM Construtora de Obras Ltda was granted the 30-year contract to build and operate the Verde 4A Small Hydro Power Plant (28 MW) located at the municipalities of Ribas do Rio Pardo and Agua Clara, state of Mato Grosso (Verde River). The power plant was named PCH Verde 4A.

In June 2014, DM Construtora de Obras sold 100% of its shares to Phoenix Geracao de Energia.

Project Information FAQ

Project Information

5 Q
The project “Verde 4A Small Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2005, the Brazilian company DM Construtora de Obras Ltda was granted the 30-year contract to build and operate the Verde 4A Small Hydro Power Plant (28 MW) located at the municipalities of Ribas do Rio Pardo and Agua Clara, state of Mato Grosso (Verde River). The power plant was named PCH Verde 4A. In June 2014, DM Construtora de Obras sold 100% of its shares to Phoenix Geracao de Energia. In February 2015, Phoenix Geracao de Energia sold 100% of its shares to Perola Energetica S.A, a subsidiary of Brookfield Energias Renovaveis. In April 2015, the company had been granted power purchase agreements to sell electricity to distribution companies starting in 2020. The company presented a winning bid of US$ 61.9/MWh (BRL 206.49/MWh). The investment committed to the power plant was estimated at US$ 80.3 million (BRL 268 million). Construction works commenced in August 2015 and were in its final stages as of June 2017. Financing information was not available. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data