Verdine Water Treatment Phase 3 Improvements
Sector: Water Supply and Storage • Location: Sulphur, Louisiana, United States of America
Source: Dodge
Scope of work includes Phase3 Improvements of the Verdine Water Treatment Plant including the construction of new raw well water iron reduction system prior to existing manganese green sand pressure filtration system consisting of new Clarifier Plate Settler and factory coated glass-lined bolted steel open top clarifier tank, new factory coated glass-lined Clarifier Effluent Retention storage tank
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Metal, Steel, Government
- Location
- Sulphur, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Verdine Water Treatment Phase 3 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work includes Phase3 Improvements of the Verdine Water Treatment Plant including the construction of new raw well water iron reduction system prior to existing manganese green sand pressure filtration system consisting of new Clarifier Plate Settler and factory coated glass-lined bolted steel open top clarifier tank, new factory coated glass-lined Clarifier Effluent Retention storage tank (closed roof), pressure filter transfer pumps, iron sediment rotary lobe pump system, new factor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Sulphur |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Metal, Steel, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
