logo

Vernal BESS Project

Sector: Power Generation (CCGT) • Location: Utah, United States

Source: Stock Titan

Project
Under Construction

The 20 MW/80 MWh Vernal Battery Energy Storage System Project in Utah is progressing with signed interconnection agreements, aiming for a ready to build target date in early 2026.

Status
Under Construction
Sector
Power Generation (CCGT), Energy Storage
Location
Utah, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Vernal BESS Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Vernal BESS Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Utah, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 20 MW/80 MWh Vernal Battery Energy Storage System Project in Utah is progressing with signed interconnection agreements, aiming for a ready to build target date in early 2026.

Original sector

Energy

Location

Country

United States of America (USA)

State

Utah

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage

Article published date

2025-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project