Vernon River Confederation Trail Structure
Sector: Steel • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
The replacement of a buried structure on the Confederation Trail section in Vernon Bridge, PEI. The scope generally includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site(s) - Excavation of earthen material to gain access to structure for rem
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The replacement of a buried structure on the Confederation Trail section in Vernon Bridge, PEI. The scope generally includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site(s) - Excavation of earthen material to gain access to structure for removal. - Removal and disposal of the existing structures. - Supply and installation of steel piles for foundation elements at pier locations and at abutments. - Construction of forms, supply and installation of reinforcement and supply and placement of concrete pier caps and abutment caps. - Supply and installation of beams for superstructure - Supply, placement and compaction of suitable backfill material against the new abutments - Supply and installation of transverse timber beams and PT timber decking. - Supply and installation of railings. - Supply and placement of topsoil and hydroseed. Site clean-up and demobilize. - Schedule would be from August 2021 to November 2021. Structures are replacements and will be new structures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
