Vernon River Confederation Trail Structure
Sector: Forest Products and Packaging • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
The replacement of a buried structure on the Confederation Trail section in Vernon Bridge, PEI. The scope generally includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site(s) - Excavation of earthen material to gain access to structure for rem
- Status
- Closed
- Sector
- Forest Products and Packaging, Metal, Bridge, Cement, Steel, Government
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Vernon River Confederation Trail Structure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The replacement of a buried structure on the Confederation Trail section in Vernon Bridge, PEI. The scope generally includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site(s) - Excavation of earthen material to gain access to structure for removal. - Removal and disposal of the existing structures. - Supply and installation of steel piles for foundation elements at pier locations and at abutments. - Construction of forms, supply and installation of reinforcement and supply and placement of concrete pier caps and abutment caps. - Supply and installation of beams for superstructure - Supply, placement and compaction of suitable backfill material against the new abutments - Supply and installation of transverse timber beams and PT timber decking. - Supply and installation of railings. - Supply and placement of topsoil and hydroseed. Site clean-up and demobilize. - Schedule would be from August 2021 to November 2021. Structures are replacements and will be new structures. |
Original sector | Active Transportation |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Metal, Bridge, Cement, Steel, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Canada
- Evanston Centre
- Woodfibre LNG Project, British Columbia
- Aga Khan Museum + Ismaili Centre
- 728 Yonge
- Children's and Women's Clinical Support Building
- Thorold Cogeneration Project Ontario Canada
- Surrey Biofuel Processing Facility Project
- Surrey Memorial Hospital Redevelopment and Expansion: Emergency Department and Critical Care Tower
