logo
ProjectCompleted

Vernon River Confederation Trail Structure

Sector: Cement • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

The replacement of a buried structure on the Confederation Trail section in Vernon Bridge, PEI. The scope generally includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site(s) - Excavation of earthen material to gain access to structure for rem

Status
Closed
Sector
Cement, Forest Products and Packaging, Bridge, Metal, Steel, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Vernon River Confederation Trail Structure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vernon River Confederation Trail Structure” is an infrastructure initiative in the Cement sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The replacement of a buried structure on the Confederation Trail section in Vernon Bridge, PEI. The scope generally includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site(s) - Excavation of earthen material to gain access to structure for removal. - Removal and disposal of the existing structures. - Supply and installation of steel piles for foundation elements at pier locations and at abutments. - Construction of forms, supply and installation of reinforcement and supply and placement of concrete pier caps and abutment caps. - Supply and installation of beams for superstructure - Supply, placement and compaction of suitable backfill material against the new abutments - Supply and installation of transverse timber beams and PT timber decking. - Supply and installation of railings. - Supply and placement of topsoil and hydroseed. Site clean-up and demobilize. - Schedule would be from August 2021 to November 2021. Structures are replacements and will be new structures.

Original sector

Active Transportation

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Forest Products and Packaging, Bridge, Metal, Steel, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project