Vertbois Building / Moussafir Architectes + Inside Outside Architecture
Sector: Road • Location: France
Source: ArchDaily
Restructuring a modern building in the Haut Marais.This 10-level commercial building designed in the 1970s by the Biro Fernier firm is a rare example in this sector of France’s 30-year post-war economic boom. It is comprised of a 7-story reinforced concrete framework on top of a 3-level underground car park built with prestressed concrete technology - innovative for the period - an inverted vault
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Restructuring a modern building in the Haut Marais.This 10-level commercial building designed in the 1970s by the Biro Fernier firm is a rare example in this sector of France’s 30-year post-war economic boom. It is comprised of a 7-story reinforced concrete framework on top of a 3-level underground car park built with prestressed concrete technology - innovative for the period - an inverted vault supporting a suspended garden in the heart of the city block and a Mansard roof profile with 6 lucarnes crowning the building, the entire structure is made of shuttered concrete.Thus, the staircases and guardrails, as well as the façades, were designed as features borrowed from locksmithing, most often suspended and dissociated from the concrete structure in order to highlight the loadbearing role of the original shell in relation to these “borrowed” features.Modernist principles and brutalist aesthetics.In addition to demonstrating the multi-purpose aspect of an ordinary structure, our aim was to assert the relevance of the building’s modernist principles (open plans, grid, and façade open to the north, ribbon windows to the south) and to highlight its brutalist aesthetic by enhancing its materiality.Although standing amidst a landmarked district composed entirely of protected historic buildings, local authorities (the ABF) determined that it had no heritage interest, thereby facilitating the transformation of both the interior distribution and its envelope.Flats like offices.Like the façade on the street, which has a pitch of 1m36, and the façade on the garden, which is 10 meters long and has no intermediate load-bearing structure, the rationality of the pillar and beam system enabled the transition from a single-purpose to a mixed-use building superimposing housing with offices. Our decision to expose the structure provided the incentive to not differentiate the dwelling spaces from the offices and to design the flats like offices.A neutral and generic structure.Like open-plan floors without intermediate columns, the principal quality of the original construction resided in its neutral and generic character. This overall grasp of the building’s structure-guided our architectural choice, from the insertion of interior elements (staircases, guardrails, floor, and ceiling coverings) to the design of the envelope by way of the choice of materials and the details regarding their implementation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
