logo

Veterinary Medicine 3B

Sector: Car parking • Location: Davis, California, United States of America

Source: UC Davis Projects

Project
Close

UC Davis proposes to construct and operate the Veterinary Medicine 3B project. The project would consist of an approximately 124,700 gross square foot (gsf) (76,100 assignable square foot (asf)) four-story building encompassing: offices and workspace; research laboratories and laboratory support space, which includes 495 asf of biosafety level 3 laboratory space; rodent vivarium space; and central

Project Information FAQ

Project Information

4 Q
The project “Veterinary Medicine 3B” is an infrastructure initiative in the Car parking sector, located in Davis, California, United States of America. Taiyo aggregates data on it from UC Davis Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

UC Davis proposes to construct and operate the Veterinary Medicine 3B project. The project would consist of an approximately 124,700 gross square foot (gsf) (76,100 assignable square foot (asf)) four-story building encompassing: offices and workspace; research laboratories and laboratory support space, which includes 495 asf of biosafety level 3 laboratory space; rodent vivarium space; and centralized research support space, which could be used as future rodent vivarium expansion space. The proposed project would not increase the campus population, and would relocate existing members of the campus population from Surge 3 and Haring Hall in the core of campus to the Health Sciences District. The project would be located in the Health Sciences District of the central campus, adjacent to Parking Lot 50 and the Veterinary Medicine Teaching Hospital, west of Garrod Drive, and south of Hutchison Drive. The project would be designed to allow for a possible realignment of Garrod Drive approximately 250 feet north of the current alignment, and to allow for a possible bicycle crossing at a realigned Garrod Drive. Construction is anticipated to start in fall 2008 and last approximately two years. The construction timing for the realignment of Garrod Drive is uncertain and depends upon funding.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data