Vetter Pharma-Fertigung, Contract Manufacturing Facility, Ravensburg

Sector: Biomass • Location: Germany

Source: Pharmaceutical Technology

Project
Closed

Vetter is a leading contract development manufacturing organisation that specialises in the aseptic filling of liquid and lyophilised drugs for international biotechnology and pharmaceutical companies. 2003 New syringe filling and packaging plant Ravensburg, Germany €150m ($186m) 2006, first production 2006–2007 September 2009 Vetter Pharma-Fertigung Vetter planning team, Axima, Schneider &am

Project Information FAQ

Project Information

4 Q
The project “Vetter Pharma-Fertigung, Contract Manufacturing Facility, Ravensburg” is an infrastructure initiative in the Biomass sector, located in Germany. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Vetter is a leading contract development manufacturing organisation that specialises in the aseptic filling of liquid and lyophilised drugs for international biotechnology and pharmaceutical companies. 2003 New syringe filling and packaging plant Ravensburg, Germany €150m ($186m) 2006, first production 2006–2007 September 2009 Vetter Pharma-Fertigung Vetter planning team, Axima, Schneider & Partner Planungsgesellschaft, SiGeKo, Georg Reisch, Friedrich Burk, Dieter Eitle, Kirchhoff-Heine StraBenbau, Manfred Wucher Peter Wiedemann, Johann Engler, Heinz Müller, Loos Deutschlan, Ondeo Industrial Solutions, Stilmas Spa, Atlas Copco Kompressoren und Drucklufttecknik, Huber & Ranner, GSA Euro-Diesel Elektro Stotz, Siemens AG/SSG Starkstrom Systeme, Axima Refrigeration, Adept Technology, Robert Bosch, Binde, BHT Hygienetechnik, Belimed, Gastec, Föratec Hof Sonderanlagenbau, Inova Pharma Systems, Montech Deutschland, Motus Engineering, Pink, Manfred Roth Edelstahl-Behälter und Apparatebau, Ruland Engineering & Consulting SBM Schoeller-Bleckmann Medizintechnik, Weiss GWE Pre-filled syringes of various types Vetter is a leading contract development manufacturing organisation that specialises in the aseptic filling of liquid and lyophilised drugs for international biotechnology and pharmaceutical companies. It is a worldwide specialist in the aseptic production of FDA-approved pre-filled application systems. Demand for the German company’s specialist services has been so great that Vetter expanded its production capacity by building a new facility near its headquarters in Ravensburg. The facility is known as Ravensburg Vetter South and was inaugurated in September 2009. The company currently manufactures 18 client products with FDA approval. The company is a lyophilisation (freeze-drying) specialist and holds 127 patents including solutions for protection against copying and counterfeiting. Vetter has global experience and expertise with all of the recognised regulatory authorities across the world. The company employs over 1,800 employees and all of their established production plants are FDA approved. In June 2010, the company announced its decision to construct Ravensburg Vetter West, a high bay warehouse facility, for cold-storage and room-temperature goods. Phase one of the facility will be constructed by the end of 2011 with an investment of €31m. The facility will accommodate space for automatic and manual visual inspection and stability chambers. Structural work on the facility was completed in May 2011, eleven months after ground breaking. Work on the interiors and the power system will be completed by the end of 2011. The new facility will enable Vetter to optimise its control and logistical processes, facilitating safe delivery of products to customers. Energy to power the facility will be derived from photovoltaic cells, biogas and geothermal sources. Ravensburg Vetter South construction Ravensburg Vetter South is located in the Mariatal/Ravensburg South commercial zone. It took a total of 36 months from the start of the detailed design of the facility to the complete validation. Detailed design started in November 2003. Construction began in February 2004 and was completed in December 2005. Performance qualification validation of the facility was completed in December 2006. The total size of the facility is 80,000m², 2,920m² of which is the production area. In addition to the main building, a technological building was built with steam production units and an emergency power supply, and a laboratory building houses facilities for chemical and microbiological analysis. The company began preliminary operations at the facility in October 2006. The production site has two filling lines: the RVS1 Multiformat line and RVS 2 Combination line. Construction of a third line is underway and is likely to be completed by 2011. Production began properly in January 2007. The facility has benefited from more than 25 years of experience in the pre-filling of syringes. The automation was planned throughout the facility, and includes door openers for use with the brand new Restricted Access Barrier System on the filling lines. The plant features maximum automation; high standards of sterility, safety and quality; self-sufficiency through its own utility and power supply; unique production lines; and a capacity of 90 million units per year. Ravensburg Vetter South was designed to meet all of the challenges that technicians and scientists are faced with when aseptically filling syringes, cartridges, and vials. The construction and outfitting of the new plant required an investment of €150m ($186m). It won the Facility of the Year Award for Process Innovation in 2007. In April 2006 Vetter purchased land adjacent to the Ravensburg Vetter South production plant. The company built a new facility for packaging and automated optical inspection which became operational in May 2009. This facility provides assembling-friendly conditions. In order to comply with the best quality and safety standards, a hygienic production area has been developed, which ensures maximum protection against contamination. Contractors The architect and designers of the facility was the Vetter planning team at Ravensburg, Germany. Technical building management was the remit of Axima of Cologne, Germany. Structural planning was carried out by Schneider & Partner Planungsgesellschaft of Ravensburg, Germany. Products The facility is set up for the contract manufacturing of innovative pharmaceutical products for parenteral administration – syringes for injection. Products include: dual-chamber syringes and cartridges that contain lyophilised/liquid or liquid/liquid; filled vials with either lyophilised or liquid contents; and filled liquid cartridges. The Ravensburg Vetter South plant has a filling line for dual-chamber systems with and without lyophilisation as well as a combination line for cartridges and vials with and without lyophilisation; both have been in production since January 2007. The plant has raised the companywide production volume of pre-filled syringes from 300 million units to almost 400 million. The company has three other facilities in and around Ravensburg, two aseptic filling facilities and one final packaging facility. The company believes it is important to concentrate production in the Ravensburg region. The facilities are independent from each other but have almost identical production processes. This increase of production lines gives operational back-ups and allows easy expansion of production if required. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data