VG Lumberyard
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
The proposed development includes 2 new buildings, lumber racks, storage structures, and the associated access drive and ground-level lumber storage areas. - Phase 1 (excavation and paving) is planned to occur from October 2023 through March 2024. The timing of Phase 2 (building construction) is to be determined
- Status
- Prospective
- Sector
- Commercial, Forest Products and Packaging, Warehouse, Manufacturing (Industrial)
- Location
- Lynden, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about VG Lumberyard
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed development includes 2 new buildings, lumber racks, storage structures, and the associated access drive and ground-level lumber storage areas. - Phase 1 (excavation and paving) is planned to occur from October 2023 through March 2024. The timing of Phase 2 (building construction) is to be determined |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lynden |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Forest Products and Packaging, Warehouse, Manufacturing (Industrial) |
Article published date | 2023-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
