Via de la Valle Repaving Project
Sector: Road • Location: Del Mar, California, United States
Source: San Diego Union-Tribune
Repaving of Via de la Valle from the I-5 on-ramps to San Andres Drive, including resurfacing 1.83 lane miles, ADA-compliant curb ramps, pedestrian push buttons, barricades, protective railings, and traffic striping. Construction to be done during nighttime hours to minimize traffic impact.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Repaving of Via de la Valle from the I-5 on-ramps to San Andres Drive, including resurfacing 1.83 lane miles, ADA-compliant curb ramps, pedestrian push buttons, barricades, protective railings, and traffic striping. Construction to be done during nighttime hours to minimize traffic impact. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
