Via Real Coastal Trail Enhancements
Sector: Water Supply and Storage • Location: Santa Barbara, California, United States of America
Source: Dodge USA
VIA REAL COASTAL TRAIL ENHANCEMENTS IN THE 1ST SUPERVISORIAL DISTRICT General project work description: Widen Roadway, install curb, gutter and sidewalks 1. Road Encroachment Permit application completed 2. Six (6) sets of Street Improvements Plans including drainage and wet utilities (1-Permits, 3-Water Resources/Flood Control, and 1-Traffic) and one (1) PDF Index Map required on first Plan Check
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Santa Barbara, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Via Real Coastal Trail Enhancements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | VIA REAL COASTAL TRAIL ENHANCEMENTS IN THE 1ST SUPERVISORIAL DISTRICT General project work description: Widen Roadway, install curb, gutter and sidewalks 1. Road Encroachment Permit application completed 2. Six (6) sets of Street Improvements Plans including drainage and wet utilities (1-Permits, 3-Water Resources/Flood Control, and 1-Traffic) and one (1) PDF Index Map required on first Plan Check. Submit only three (3) sets of prints for subsequent submittals. 3. Six (6) sets of Dry Utility ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Barbara |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
