Viana Thermal Power Plant
Sector: Commercial • Location: Espirito Santo, Brazil
Source: World Bank Group
The company Termeletrica Viana S.A., a wholly-owned subsidiary of Wartsila, was granted an authorization by the regulatory agency ANEEL to build a 174.6-MW thermal power plant located in the state of Espirito Santo(municipality of Viana). The thermal power plant was set to use heavy oil as fuel.
In June 2007, the company took part in a competitive bidding process to sell electricity to the re
- Status
- Prospective
- Sector
- Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government
- Location
- Espirito Santo, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Viana Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The company Termeletrica Viana S.A., a wholly-owned subsidiary of Wartsila, was granted an authorization by the regulatory agency ANEEL to build a 174.6-MW thermal power plant located in the state of Espirito Santo(municipality of Viana). The thermal power plant was set to use heavy oil as fuel. In June 2007, the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (a 15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). Of the 174.6 MW of electricity produced, 121 MW was the capacity committed to the referred power purchase agreement. In January 2008, Termeletrica Viana signed a 35-year contract with ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. In February 2008, Wartsila sold 80.1% of the shares in the project company to FIP Brasil Energia. Termeletrica Viana committed to invest US$ 150 million (BRL 300 million) in the facility. Although the construction works started in September 2008, financial closure for the project was only achieved in July 2009, when the company was granted a US$ 111.9 million (BRL 223.8 million) loan contract from BNDES, a state-owned development bank. Construction works on this plant were concluded in December 2009. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Espirito Santo |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Oil and Gas, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
