logo

Viana Thermal Power Plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Active

The company Termeletrica Viana S.A., a wholly-owned subsidiary of Wartsila, was granted an authorization by the regulatory agency ANEEL to build a 174.6-MW thermal power plant located in the state of Espirito Santo(municipality of Viana). The thermal power plant was set to use heavy oil as fuel.

In June 2007, the company took part in a competitive bidding process to sell electricity to the re

Project Information FAQ

Project Information

4 Q
The project “Viana Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The company Termeletrica Viana S.A., a wholly-owned subsidiary of Wartsila, was granted an authorization by the regulatory agency ANEEL to build a 174.6-MW thermal power plant located in the state of Espirito Santo(municipality of Viana). The thermal power plant was set to use heavy oil as fuel. In June 2007, the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (a 15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). Of the 174.6 MW of electricity produced, 121 MW was the capacity committed to the referred power purchase agreement. In January 2008, Termeletrica Viana signed a 35-year contract with ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. In February 2008, Wartsila sold 80.1% of the shares in the project company to FIP Brasil Energia. Termeletrica Viana committed to invest US$ 150 million (BRL 300 million) in the facility. Although the construction works started in September 2008, financial closure for the project was only achieved in July 2009, when the company was granted a US$ 111.9 million (BRL 223.8 million) loan contract from BNDES, a state-owned development bank. Construction works on this plant were concluded in December 2009.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data