Vic Transmission Project
Completed · Victoria · Last reported Feb 2025
Source: Energy Magazine
AusNet has successfully energised a new terminal station, which will facilitate the connection of the Koorangie Energy Storage System (KESS) to the Victorian transmission network. The 220kV Koorangie Terminal Station will support both the KESS and future connections to the state’s energy grid.
- Status
- Closed
- Sector
- Energy Storage, Power Transmission, Power Generation (CCGT)
- Location
- Victoria, Australia
- Updated
- 22 Jul 2026
- Source
- Energy Magazine
ConstructChat
Ask ConstructChat about Vic Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AusNet has successfully energised a new terminal station, which will facilitate the connection of the Koorangie Energy Storage System (KESS) to the Victorian transmission network. The 220kV Koorangie Terminal Station will support both the KESS and future connections to the state’s energy grid. |
Original sector | Energy |
Location
Country | Australia |
State | Victoria |
Source
Source | Energy Magazine |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
