Vidullanka Sheen & Ganthuna & Ethamala Ella SHPPs
Sector: Wind • Location: Sri Lanka
Source: World Bank Group
Vidullanka developed the 1.2MW Ganthuna and 0.56MW Sheen small hydropower plants, in Ganthuna-Aranayake, Kegale District (Ganthuna) and Nuwera Eliya (Sheen). The third plant was the 2.0MW Ethamalla small hydropower plant, Matara District in the Southern Province.
Sheen consisted of 1 Penton turbine of 500kW, and 1 penton of 60kW. The project generated 2.2Gwh annually, at 46% plant load factor. Th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Vidullanka developed the 1.2MW Ganthuna and 0.56MW Sheen small hydropower plants, in Ganthuna-Aranayake, Kegale District (Ganthuna) and Nuwera Eliya (Sheen). The third plant was the 2.0MW Ethamalla small hydropower plant, Matara District in the Southern Province. Sheen consisted of 1 Penton turbine of 500kW, and 1 penton of 60kW. The project generated 2.2Gwh annually, at 46% plant load factor. The project was commissioned in October 2008. The turn-key EPC contractor was Elpitiya, a member of the Aitken Spence Group. Ganthuna consisted of 2 Pelton turbines of 600kW each. The project generated 4GWh annually, at 38% load factor. The project was commissioned in March 2010 and fed from the Gurugodaoya River. The project held a 20 year PPA with Ceylon Electricity Board. Ethamalla consisted of 3 Francis turbines, two of 800kW and 1 of 400kWh. The project generated 1.2GWh annually. Financial closure date was unknown, but estimated here at March 2010 (commissioning Ganthuna). Total cost was unknown, but conservatively ESTIMATED at US$1.7 million (@US$1.0 million/MW). Sheen and Ganthuna applied for UNFCCC CDM financing. The coordinates were: Gantuna Udagama: 80o 25’ 13” 7o 07’ 55.8” Ethamala Ella: 80o 29’ 46” 6o 13’ 37” Sheen: 80o 41’ 12” 7o 00’ 18” http://www.vidullanka.com/sheen.shtml http://cdm.unfccc.int/filestorage/D/Q/J/DQJYP01AV8WKTRLSU6ZHO354ENGBFM/Vidullanka%20PDD.pdf?t=SkN8bWV4dmU1fDBsRcZdcO5q7HhLGe2hqTt9 http://www.vidullanka.com/ganthuna.shtml |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
