logo

Vidullanka Sheen & Ganthuna & Ethamala Ella SHPPs

Sector: Hydro • Location: Sri Lanka

Source: World Bank Group

Project
Active

Vidullanka developed the 1.2MW Ganthuna and 0.56MW Sheen small hydropower plants, in Ganthuna-Aranayake, Kegale District (Ganthuna) and Nuwera Eliya (Sheen). The third plant was the 2.0MW Ethamalla small hydropower plant, Matara District in the Southern Province.

Sheen consisted of 1 Penton turbine of 500kW, and 1 penton of 60kW. The project generated 2.2Gwh annually, at 46% plant load factor. Th

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vidullanka Sheen & Ganthuna & Ethamala Ella SHPPs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vidullanka Sheen & Ganthuna & Ethamala Ella SHPPs” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vidullanka developed the 1.2MW Ganthuna and 0.56MW Sheen small hydropower plants, in Ganthuna-Aranayake, Kegale District (Ganthuna) and Nuwera Eliya (Sheen). The third plant was the 2.0MW Ethamalla small hydropower plant, Matara District in the Southern Province. Sheen consisted of 1 Penton turbine of 500kW, and 1 penton of 60kW. The project generated 2.2Gwh annually, at 46% plant load factor. The project was commissioned in October 2008. The turn-key EPC contractor was Elpitiya, a member of the Aitken Spence Group. Ganthuna consisted of 2 Pelton turbines of 600kW each. The project generated 4GWh annually, at 38% load factor. The project was commissioned in March 2010 and fed from the Gurugodaoya River. The project held a 20 year PPA with Ceylon Electricity Board. Ethamalla consisted of 3 Francis turbines, two of 800kW and 1 of 400kWh. The project generated 1.2GWh annually. Financial closure date was unknown, but estimated here at March 2010 (commissioning Ganthuna). Total cost was unknown, but conservatively ESTIMATED at US$1.7 million (@US$1.0 million/MW). Sheen and Ganthuna applied for UNFCCC CDM financing. The coordinates were: Gantuna Udagama: 80o 25’ 13” 7o 07’ 55.8” Ethamala Ella: 80o 29’ 46” 6o 13’ 37” Sheen: 80o 41’ 12” 7o 00’ 18” http://www.vidullanka.com/sheen.shtml http://cdm.unfccc.int/filestorage/D/Q/J/DQJYP01AV8WKTRLSU6ZHO354ENGBFM/Vidullanka%20PDD.pdf?t=SkN8bWV4dmU1fDBsRcZdcO5q7HhLGe2hqTt9 http://www.vidullanka.com/ganthuna.shtml

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project