Vientos de Olavarría Wind Farm
One of 171 projects Taiyo tracks in Buenos Aires.
Source: Evwind
The Vientos de Olavarría Wind Farm, Ternium's first major renewable energy project, consists of 22 Vestas wind turbines with a total installed capacity of 99 MW. The project aims to replace nearly 90% of grid electricity consumption in Argentina and contributes to Ternium's emissions reduction goals by 2030.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Warehouse
- Location
- Olavarría, Buenos Aires, Argentina
- Updated
- 22 Jul 2026
- Source
- Evwind
ConstructChat
Ask ConstructChat about Vientos de Olavarría Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Vientos de Olavarría Wind Farm, Ternium's first major renewable energy project, consists of 22 Vestas wind turbines with a total installed capacity of 99 MW. The project aims to replace nearly 90% of grid electricity consumption in Argentina and contributes to Ternium's emissions reduction goals by 2030. |
Original sector | Energy |
Budget |
Location
Country | Argentina |
State | Buenos Aires |
City | Olavarría |
Source
Source | Evwind |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Warehouse |
Article published date | 2025-03-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
