Vierra Canyon Road Patch Paving
Start · California · Last reported Oct 2024
Source: Dodge USA
Grind Area (1) of (L=41 X W=22 X D=2.5 ) of roadway surface and replace it with 2.5 of HMA Grind Area (2) of (L=33 X W=22 X D=2.5 ) of roadway surface and replace it with 2.5 of HMA Grind Area (3) of (L=10 X W=22 X D=2.5 ) of roadway surface and replace it with 2.5 of HMA
- Status
- Prospective
- Sector
- Government, Road, Commercial
- Location
- Salinas, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Vierra Canyon Road Patch Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Grind Area (1) of (L=41 X W=22 X D=2.5 ) of roadway surface and replace it with 2.5 of HMA Grind Area (2) of (L=33 X W=22 X D=2.5 ) of roadway surface and replace it with 2.5 of HMA Grind Area (3) of (L=10 X W=22 X D=2.5 ) of roadway surface and replace it with 2.5 of HMA |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Salinas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Road, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
