Viet Nam Renewable Energy Accelerating Change

Sector: Solar • Location: Viet Nam

Source: World Bank Group

Project
Dropped

The Renewable Energy Accelerating Change (REACH) Project mobilizes public financing to alleviate grid constraints hampering deployment of VRE. The scope of the proposed project has been crafted to focus on the most urgent transmission and system needs that are complementary to ongoing and planned investments in VRE generation. The electricity grid needs to be upgraded to: (i) sustainably integrate

Status
Failure
Sector
Solar, Power Generation (CCGT), Wind, Government
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Viet Nam Renewable Energy Accelerating Change

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Viet Nam Renewable Energy Accelerating Change” is an infrastructure initiative in the Solar sector, located in Viet Nam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

dropped

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Renewable Energy Accelerating Change (REACH) Project mobilizes public financing to alleviate grid constraints hampering deployment of VRE. The scope of the proposed project has been crafted to focus on the most urgent transmission and system needs that are complementary to ongoing and planned investments in VRE generation. The electricity grid needs to be upgraded to: (i) sustainably integrate without curtailment existing privately-owned VRE projects, and (ii) unlock GWs of new privately-owned VRE projects. The projected VRE deployment growth will require continuous investments to modernize and transition the system for successfully adopting these new disruptive technologies. The REACH Project is also part (finances a sub-set of these investments) of the public investments for grid capacity upgrades that are being proposed under PSDP 8. Additional investments needed to upgrade the grid capacity under the plan would be mobilized through EVN’s own resources or through borrowing from local and international partners. This could also include follow-on financing from the World Bank as part of a series of investments in the coming years. The REACH Project has two components: (i) Component 1: Grid Strengthening for VRE Integration; and (ii) Dispatch Management. The investments financed under the project aim at reducing existing and future curtailment of VRE projects (900MW of which 300 MW of onshore wind and 600MWp of solar) and unlocking the space in the grid for new VRE projects (2.6 GW of which 1 GW of onshore wind and 1.6 GW of offshore wind). Based on the analysis conducted, the sub-projects being proposed are the ones that would have the most immediate impact on expanding VRE integration capacity of the grid.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Wind, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project