logo

Vietnam Time Use Survey Production

Sector: Residential • Location: Viet Nam

Source: World Bank Group

Project
Closed

The Vietnam Time Use Survey Production Project will assist the General Statistics Office (GSO) to implement a nationally representative time use survey following international best practices but adapted to Vietnam’s context. The survey design shall be based on results of a pilot time use survey, implemented by the GSO and the World Bank with financing support from the Second Australia Bank Partner

Project Information FAQ

Project Information

5 Q
The project “Vietnam Time Use Survey Production” is an infrastructure initiative in the Residential sector, located in Viet Nam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Vietnam Time Use Survey Production Project will assist the General Statistics Office (GSO) to implement a nationally representative time use survey following international best practices but adapted to Vietnam’s context. The survey design shall be based on results of a pilot time use survey, implemented by the GSO and the World Bank with financing support from the Second Australia Bank Partnership (ABP2) Trust Fund - Gender Pillar. The survey will cover 6000 individuals across all provinces of the country, stratified by six regions – Mekong Delta, South East, Central Highlands, Northern and Coastal Central, Midland and Northern Mountains and Red River Delta - and is designed to be representative at the regional level. Ethnic minorities shall be oversampled so that inference of male and female’s differences in time use patterns within groups is feasible with a reasonable degree of certainty.The project will have three components, namely (i) survey preparation and data collection – covering the costs for fieldwork preparation and data collection such as finalization of survey tools, training, sampling, data enumeration and field supervision activities, (ii) data analysis and dissemination - which covers data analysis, reporting and dissemination activities for both the data and the report that will be made available to the public and (iii) project management – covering professional audit of the project and the operating costs, which includes project coordination, procurement and financial management. The GSO is appointed as the single executing agency in charge of this operation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data