logo

Vikram Solar BESS Manufacturing Facility Phase 1

Sector: Energy Storage • Location: Oragadam, Tamil Nadu, India

Source: Equitymaster

Project
Planned

Vikram Solar approved a capital expenditure of about Rs 43.7 billion through its subsidiary VSL Powerhive for Phase 1 of its battery energy storage system (BESS). Phase 1 includes commissioning a 5 GWh BESS manufacturing facility at Oragadam, Tamil Nadu by FY27. The company also plans a 7.5 GWh battery cell manufacturing facility by FY29, subject to approvals, with a dedicated R&D lab.

Status
Prospective
Sector
Energy Storage, Solar, Manufacturing (Industrial)
Location
Oragadam, Tamil Nadu, India
Updated
22 Jul 2026
Source
Equitymaster

ConstructChat

Ask ConstructChat about Vikram Solar BESS Manufacturing Facility Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vikram Solar BESS Manufacturing Facility Phase 1” is an infrastructure initiative in the Energy Storage sector, located in Oragadam, Tamil Nadu, India. Taiyo aggregates data on it from Equitymaster.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vikram Solar approved a capital expenditure of about Rs 43.7 billion through its subsidiary VSL Powerhive for Phase 1 of its battery energy storage system (BESS). Phase 1 includes commissioning a 5 GWh BESS manufacturing facility at Oragadam, Tamil Nadu by FY27. The company also plans a 7.5 GWh battery cell manufacturing facility by FY29, subject to approvals, with a dedicated R&D lab.

Original sector

Energy

Budget

Location

Country

India

State

Tamil Nadu

City

Oragadam

Source

Source

Equitymaster

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Manufacturing (Industrial)

Article published date

2025-12-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project