logo

Vila Acre I Wind Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The French Volatalia was granted the authorization to build a wind power plant located in the state of Rio Grande do Norte, municipality of Serra do Mel (27.3 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in April 2016. The company created the following special purpose companies to manage the project:

USINA DE ENERGIA EOLICA VILA ACRE I S.A – EOL Vila Ac

Status
Prospective
Sector
Commercial, Wind, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vila Acre I Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vila Acre I Wind Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The French Volatalia was granted the authorization to build a wind power plant located in the state of Rio Grande do Norte, municipality of Serra do Mel (27.3 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in April 2016. The company created the following special purpose companies to manage the project: USINA DE ENERGIA EOLICA VILA ACRE I S.A – EOL Vila Acre I (27,3MW) The total investment in the power plant was estimated at US$ 31.7 million (BRL 100.8 million), financed with the sponsor's equity. Construction works commenced in January 2017, and were nearly concluded by June2017. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. Vila Acre I won the public bidding that took place in November 2015 by offering an average tariff of US$ 59/MWh (BRL 210.98/MWh). The project companies signed 20-year power purchase agreements with the several electricity distribution companies. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project