Villa H / ARK-architecture
Closed · Tunisia · Last reported Dec 2025
Source: ArchDaily
Text description provided by the architects.Set within a 504 m² plot in a dense residential fabric, Villa H explores the balance between compactness and openness — an exercise in clarity, light, and restraint. The project stems from a challenge: accommodating a generous domestic program while preserving a sense of space and calm. The villa unfolds across three levels: a generous basement hosting t
- Status
- Closed
- Sector
- Residential, Car parking, Commercial, Automotive
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Villa H / ARK-architecture
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.Set within a 504 m² plot in a dense residential fabric, Villa H explores the balance between compactness and openness — an exercise in clarity, light, and restraint. The project stems from a challenge: accommodating a generous domestic program while preserving a sense of space and calm. The villa unfolds across three levels: a generous basement hosting the technical and leisure areas along with the parking, a compact ground floor freeing a wide garden with a pool, and an upper level comprising four sunlit suites. |
Location
Country | Tunisia |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Residential, Car parking, Commercial, Automotive |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in Tunisia
- STRENGTHENING TUNISIA FOOD RESILIENCE
- STEG GAZ II
- ONAS IV
- Tunisie Telecom
- OFFICE DES CEREALES PERMANENT WORKING CAPITAL
- Tunisia - MIC-TAF Grant for the preparation of the project of "Office de Développement Sylvopastorale du Nord-Ouest de la Tunisie (ODESYPANO)"
- Culture and sustainable active tourism
- Sustainable development in territorial energy production
