logo
ProjectComplete

VILLA RICA TRAILHEAD

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

Villa Rica Trailhead: City of Villa Rica, Carroll County, GA. Fullerville Park, located at the intersection of Ball Park Rd and Rockmart Rd. Fullerville Park is an existing active park. On the western portion of the property is a wooded area that sits adjacent to abandoned railroad ROW. It is the desire of the City to install a linear trail system along this ROW. The improvements will include a pa

Status
Closed
Sector
Cement, Rail, Road, Car parking, Government, Automotive
Location
Villa Rica, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about VILLA RICA TRAILHEAD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “VILLA RICA TRAILHEAD” is an infrastructure initiative in the Cement sector, located in Villa Rica, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Villa Rica Trailhead: City of Villa Rica, Carroll County, GA. Fullerville Park, located at the intersection of Ball Park Rd and Rockmart Rd. Fullerville Park is an existing active park. On the western portion of the property is a wooded area that sits adjacent to abandoned railroad ROW. It is the desire of the City to install a linear trail system along this ROW. The improvements will include a parking lot which will be an extension of Ball Park Dr, which provides access to the park. Approximately 55 parking spaces will be provided. Amenities included within this trailhead are concrete sidewalks to provide connection to the future trail and a pedestrian pavilion. The total length of this project is 850 LF. Vehicular access to the trailhead parking will be provided by a two lane asphalt local road with no curb and gutter (840 LF). An 8' concrete sidewalk is proposed along the parking lot (950 LF).

Location

Country

United States of America (USA)

State

Georgia

City

Villa Rica

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Cement, Rail, Road, Car parking, Government, Automotive

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project