Village at Novato Mixed Use Development
Sector: Commercial • Location: Novato, California, United States of America
Source: Dodge USA
Construction of three (3) new buildings and site improvements for 178 new residential units of which 35 are below market rate units, and 14,000 square feet of retail space - The buildings consist of one (1) 3-story building with retail on the ground floor, and 26 residential units on the upper two floors, and two (2) 4-story buildings with a combined total of 152 residential units - Additional sit
- Status
- Prospective
- Sector
- Commercial, Car parking, Residential, Automotive, Manufacturing (Industrial)
- Location
- Novato, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Village at Novato Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of three (3) new buildings and site improvements for 178 new residential units of which 35 are below market rate units, and 14,000 square feet of retail space - The buildings consist of one (1) 3-story building with retail on the ground floor, and 26 residential units on the upper two floors, and two (2) 4-story buildings with a combined total of 152 residential units - Additional site improvements include a 12,500 square foot plaza, and 307 surface parking spaces throughout the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Novato |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Residential, Automotive, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
