Village of Borden - Sewage Lift Station Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The Village of Borden - Sewage Lift Station Upgrade project will replace the two existing pumps and the control panel. The scope of work for the Project includes replacing the existing Gorman Rupp T-3 pumps and a control panel with new submersible Flygt pumps and a new Flygt control panel in a weather proof cabinet, a new pump lifting device, level sensors, structural repairs inside the wet well,
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Village of Borden - Sewage Lift Station Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Village of Borden - Sewage Lift Station Upgrade project will replace the two existing pumps and the control panel. The scope of work for the Project includes replacing the existing Gorman Rupp T-3 pumps and a control panel with new submersible Flygt pumps and a new Flygt control panel in a weather proof cabinet, a new pump lifting device, level sensors, structural repairs inside the wet well, electrical and a new call out system. It will also be site ready for a new generator for backup power to be installed at a later date. The Project will result in an efficient and effective sewage lift station system which will prevent potential flooding into the nearby creek. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
