logo

Village of Burns Lake Water Treatment Plant

Sector: Wind • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The proposed project will address the Northern Authority request for a reduction in both manganese and arsenic through the introduction of treatment to the Village’s water system. The existing water system is not meeting the water quality requirements of the Guidelines for Canadian Drinking Water in the manganese and arsenic categories. The project works will include: - Supply and install approxi

Project Information FAQ

Project Information

5 Q
The project “Village of Burns Lake Water Treatment Plant” is an infrastructure initiative in the Wind sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project will address the Northern Authority request for a reduction in both manganese and arsenic through the introduction of treatment to the Village’s water system. The existing water system is not meeting the water quality requirements of the Guidelines for Canadian Drinking Water in the manganese and arsenic categories. The project works will include: - Supply and install approximately three submersible well pumps in existing 3 wells complete with electrical and mechanical upgrades to the existing pump house; - Supply and install approximately 100m of raw water supply pipe; - Construct water treatment building; - Install approximately 2 biological manganese removal filters; - Install approximately 2 chemical arsenic removal filters; - Install two vertical turbine booster pumps; - Install one chlorine contact tank; - Install one filter backwash water holding tank; - Install two water discharge pumps complete with process and controls; - Install sodium hypochlorite pump and injections system; - Install ferric chloride pump and injections system; - Install backwash water force main; - Install sanitary sewer gravity pipe; - Install security fencing; - Installation of on-site road and parking improvements; and, - Necessary electrical, mechanical, HVAC, communications, SCADA, plumbing and safety works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data