Village of Carp Water Quality Treatment Facility Upgrades Including New Building and granular activated carbon contactors
Sector: Natural Gas • Location: Ontario, Canada
Source: Infrastructure Canada
Design and construction of granular activated carbon contactors (GAC) to resolve taste and odour issues in the source water before chlorination. This will involve construction of a new building to house the GAC treatment. Facility improvements and electrical system upgrades will also be completed within the existing Carp Water Treatment Facility building, including a new transfer switch, replaceme
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Design and construction of granular activated carbon contactors (GAC) to resolve taste and odour issues in the source water before chlorination. This will involve construction of a new building to house the GAC treatment. Facility improvements and electrical system upgrades will also be completed within the existing Carp Water Treatment Facility building, including a new transfer switch, replacement of the Programmable Logic Controllers (PLC), improvements to power monitoring, surge protection, and communication points to Supervisory Control and Data Acquisition (SCADA) and the Human-Machine Interface (HMI), replacement of the Motor Control Center (MCC), new priority alarm panel and surge arrestor termination panel, improvements to the chlorine pumping system, and additional of flow meters (2) on the water intake pipes. Switching the power and heating source of the GAC building from electric to natural gas. Additionally, contaminated soil within the existing water treatment facility property will undergo remediation and removal. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
