Village of Climax - Landfill Project
Sector: Waste Processing and Treatment • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The main objective of the project is to complete an environmental site assessment, develop a construction plan for the decommissioning and closure of the landfill. The current landfill facility stopped accepting waste in 2015. There are piles of concrete, branches, wood, and clean debris on the surface but historical landfilling was primarily conducted in buried pits. The pits are dug style, unlin
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Village of Climax - Landfill Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the project is to complete an environmental site assessment, develop a construction plan for the decommissioning and closure of the landfill. The current landfill facility stopped accepting waste in 2015. There are piles of concrete, branches, wood, and clean debris on the surface but historical landfilling was primarily conducted in buried pits. The pits are dug style, unlined waste disposal cells and historical burning of waste on-site did occur. An overall site area of approximately 10 acres has been assumed for the purpose of developing the cost estimate. Within that area, waste covers an area of approximately 100m by 100m square. It is assumed that the entire 100m by 100m area will require engineering cover. Scope of work includes conducting Phase II - Environmental Site Assessment (ESA), and corrective action plan for the removal of surface materials; capping of mounded and buried water to prevent surface infiltration and leachate generation; Leachate Management; and Gas Migration and management, as required. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade