Village of Cold Spring Pedestrian Tunnel Repairs
Sector: Tunnel • Location: Cold Spring, New York, United States of America
Source: Dodge
The work shall consist of furnishing all labor, materials, and equipment necessary to perform spall and crack repairs including injection grouting on the interior surface of an existing pedestrian tunnel in the Village of Cold Spring. Other related work shall include preparing, restoring and cleaning the project site all in accordance with the Bid Documents and as directed by the Engineer and/or V
- Status
- Closed
- Sector
- Tunnel, Government, Road, Commercial
- Location
- Cold Spring, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Village of Cold Spring Pedestrian Tunnel Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist of furnishing all labor, materials, and equipment necessary to perform spall and crack repairs including injection grouting on the interior surface of an existing pedestrian tunnel in the Village of Cold Spring. Other related work shall include preparing, restoring and cleaning the project site all in accordance with the Bid Documents and as directed by the Engineer and/or Village. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Cold Spring |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Tunnel, Government, Road, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
