logo

Village of Hodgeville - Water Well and Water Treatment Plant Improvements

Sector: Water Supply and Storage • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Pre-Construction

Hodgeville’s water treatment plant produces water which meets all regulated drinking water quality guidelines, however, does not meet drinking water aesthetic objectives for Sulphate, Conductivity, Total Dissolved Solids, Total Hardness, and Sodium. The sodium hypochlorite dosage used exceeds the maximum usage limit for the system. In March 2022, the Water Security Agency of Saskatchewan placed tw

Project Information FAQ

Project Information

5 Q
The project “Village of Hodgeville - Water Well and Water Treatment Plant Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hodgeville’s water treatment plant produces water which meets all regulated drinking water quality guidelines, however, does not meet drinking water aesthetic objectives for Sulphate, Conductivity, Total Dissolved Solids, Total Hardness, and Sodium. The sodium hypochlorite dosage used exceeds the maximum usage limit for the system. In March 2022, the Water Security Agency of Saskatchewan placed two conditions on the Permit to Operate for the Village’s water treatment plant: - Plan by 2024 - Complete by 2027 The Village hired Spring Creek Consulting in October 2022 to complete a Waterworks Upgrade Plan which identified options for upgrades and recommendations on which Waterworks upgrades would suit the Village’s needs. Based on the report, the village will proceed with: - Drilling two (2) new groundwater wells into a deep aquifer; and - Construct a new reverse osmosis (RO) membrane treatment system housed in an expansion of the existing WTP.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data