logo

Village of Mayo Swimming Pool Boiler Replacement and Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

The project consists of the rehabilitation of an existing seasonal swimming pool facility in the community of Mayo, Yukon prior reopening the facility for the 2020 swimming season. The project will consists of general public safety repairs (floor patching, repair and coating, signage etc.), boiler replacement, and mechanical system upgrades (pipes, valves, pumps, skimmers, drains, chemical feed sy

Status
Closed
Sector
Government, Chemical (Industrial), Manufacturing (Industrial), Seaport
Location
Yukon, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Village of Mayo Swimming Pool Boiler Replacement and Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Village of Mayo Swimming Pool Boiler Replacement and Upgrades” is an infrastructure initiative in the Government sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the rehabilitation of an existing seasonal swimming pool facility in the community of Mayo, Yukon prior reopening the facility for the 2020 swimming season. The project will consists of general public safety repairs (floor patching, repair and coating, signage etc.), boiler replacement, and mechanical system upgrades (pipes, valves, pumps, skimmers, drains, chemical feed system, vacuum ports etc.). The project will contribute to improved access to quality recreational infrastructure in Mayo, Yukon. The Village of Mayo notified the Yukon Government, Community Services in the spring of 2019 that the pool boiler needed continuous repairs and attendance to maintain operation. Community Services engaged a mechanical consultant to determine the extent of work required to replace the boiler. It was then determined that the structure supporting the boiler and mechanical systems was also in disrepair and will require replacement. In addition, Yukon Government, Environmental Health Services engaged the services of Delta-T Consultants to inspect multiple community swimming pool facilities during the summer months of 2019. The Village of Mayo pool was inspected on July 25, 2019 and subsequent report outlining condition and required repairs was issued August 8, 2019. Work required as part of this project as outlined in the Delta-T report includes: • Boiler replacement and structural repairs; • Mechanical system - piping and white goods repairs and retrofits; • This may include, pipe replacement, valves, pumps, skimmers, drains, returns and vacuum ports and chemical feed system. • General public safety repairs; • This may include floor patching, repair and coatings, signage.

Original sector

Community, Culture and Recreation

Budget

Location

Country

Canada

State

Yukon

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Government, Chemical (Industrial), Manufacturing (Industrial), Seaport

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project