Village of Mayo Swimming Pool Boiler Replacement and Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The project consists of the rehabilitation of an existing seasonal swimming pool facility in the community of Mayo, Yukon prior reopening the facility for the 2020 swimming season. The project will consists of general public safety repairs (floor patching, repair and coating, signage etc.), boiler replacement, and mechanical system upgrades (pipes, valves, pumps, skimmers, drains, chemical feed sy
- Status
- Closed
- Sector
- Government, Chemical (Industrial), Manufacturing (Industrial), Seaport
- Location
- Yukon, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Village of Mayo Swimming Pool Boiler Replacement and Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the rehabilitation of an existing seasonal swimming pool facility in the community of Mayo, Yukon prior reopening the facility for the 2020 swimming season. The project will consists of general public safety repairs (floor patching, repair and coating, signage etc.), boiler replacement, and mechanical system upgrades (pipes, valves, pumps, skimmers, drains, chemical feed system, vacuum ports etc.). The project will contribute to improved access to quality recreational infrastructure in Mayo, Yukon. The Village of Mayo notified the Yukon Government, Community Services in the spring of 2019 that the pool boiler needed continuous repairs and attendance to maintain operation. Community Services engaged a mechanical consultant to determine the extent of work required to replace the boiler. It was then determined that the structure supporting the boiler and mechanical systems was also in disrepair and will require replacement. In addition, Yukon Government, Environmental Health Services engaged the services of Delta-T Consultants to inspect multiple community swimming pool facilities during the summer months of 2019. The Village of Mayo pool was inspected on July 25, 2019 and subsequent report outlining condition and required repairs was issued August 8, 2019. Work required as part of this project as outlined in the Delta-T report includes: Boiler replacement and structural repairs; Mechanical system - piping and white goods repairs and retrofits; This may include, pipe replacement, valves, pumps, skimmers, drains, returns and vacuum ports and chemical feed system. General public safety repairs; This may include floor patching, repair and coatings, signage. |
Original sector | Community, Culture and Recreation |
Budget |
Location
Country | Canada |
State | Yukon |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Government, Chemical (Industrial), Manufacturing (Industrial), Seaport |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Wood Buffalo Water Treatment Plant Expansion
- Coca-Cola Centre
- Children's and Women's Clinical Support Building
- Alberta Schools Alternative Procurement Phase 2
- New Central Library & Library Plaza - LRT Encapsulation
