logo

Village of Mistatim - Landfill Cover

Sector: Government • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project objective is to decommission and reclaim the landfill of the Village of Mistatim, non-compliant with the best management practices for landfill construction. The landfilled areas being decommissioned have a surface area of 1.45 hectares and was permitted to only receive municipal waste during its operation. The landfill is currently close and ready for decommissioning. Environmental Si

Project Information FAQ

Project Information

5 Q
The project “Village of Mistatim - Landfill Cover” is an infrastructure initiative in the Government sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project objective is to decommission and reclaim the landfill of the Village of Mistatim, non-compliant with the best management practices for landfill construction. The landfilled areas being decommissioned have a surface area of 1.45 hectares and was permitted to only receive municipal waste during its operation. The landfill is currently close and ready for decommissioning. Environmental Site Assessment Level II has been completed and the CAP is underway; therefore, the scope of the project includes completing and implementing a Decommissioning and Reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and Reclamation activities include the design and construction of the final engineered cover, storm water management, removal of existing infrastructure, recycling, metals, clean wood piles, and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. Landfill will be converted to a transfer station where bins will only be used. Reclaimed landfill will be owned by the Village of Mistatim with the intended use of a transfer station surrounding by undisturbed grassland. Decommissioning and reclamation of the landfilled areas will attenuate the generation of leachate which in turn increases the capacity to reduce soil pollutants in line with the Environmental Quality Outcomes of the Green Infrastructure Stream of the ICIP.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data