logo

Village of Mistatim - Landfill Cover

Sector: Water Supply and Storage • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project objective is to decommission and reclaim the landfill of the Village of Mistatim, non-compliant with the best management practices for landfill construction. The landfilled areas being decommissioned have a surface area of 1.45 hectares and was permitted to only receive municipal waste during its operation. The landfill is currently close and ready for decommissioning. Environmental Si

Status
Prospective
Sector
Water Supply and Storage, Government, Waste Processing and Treatment
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Village of Mistatim - Landfill Cover

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Village of Mistatim - Landfill Cover” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project objective is to decommission and reclaim the landfill of the Village of Mistatim, non-compliant with the best management practices for landfill construction. The landfilled areas being decommissioned have a surface area of 1.45 hectares and was permitted to only receive municipal waste during its operation. The landfill is currently close and ready for decommissioning. Environmental Site Assessment Level II has been completed and the CAP is underway; therefore, the scope of the project includes completing and implementing a Decommissioning and Reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and Reclamation activities include the design and construction of the final engineered cover, storm water management, removal of existing infrastructure, recycling, metals, clean wood piles, and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. Landfill will be converted to a transfer station where bins will only be used. Reclaimed landfill will be owned by the Village of Mistatim with the intended use of a transfer station surrounding by undisturbed grassland. Decommissioning and reclamation of the landfilled areas will attenuate the generation of leachate which in turn increases the capacity to reduce soil pollutants in line with the Environmental Quality Outcomes of the Green Infrastructure Stream of the ICIP.

Original sector

Waste Management

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project