Village of Muenster - Interior COVID Renovation Muenster Curling Club
Completed · Saskatchewan
Source: Infrastructure Canada
Project involves removal of interior walls, replacement of separate entrance and exit doors, relocating electrical, plumbing and heating infrastructure, upgrading the air quality control and repair/replacement of flooring and ceiling finishing - in order to resize the existing entrance and front section of the main lobby. Retrofitting the existing facility that is owned by the Village of Muenster
- Status
- Closed
- Sector
- Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Village of Muenster - Interior COVID Renovation Muenster Curling Club
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project involves removal of interior walls, replacement of separate entrance and exit doors, relocating electrical, plumbing and heating infrastructure, upgrading the air quality control and repair/replacement of flooring and ceiling finishing - in order to resize the existing entrance and front section of the main lobby. Retrofitting the existing facility that is owned by the Village of Muenster will provide a trusted, safe space that is conducive to physical distancing that is safely and reliably supported with clean, heated air via efficient air quality control mechanisms. The following objectives will be met: support of physical distancing; approx. 1200 square feet of pre-existing space will be opened up to enable one entry and one exit without any overlap via the removal of two walls; retrofitting old heating/cooling and electrical systems; new plumbing; support job creation and build stronger communities; replace aging heating units and installing air quality controls; efficiently and effectively heating the space will be accomplished with two heating units to service the 2800 square feet two story facility; filtration of the air via the furnace, air conditioning unit and the air exchanger will aid in removing airborne particles; enlarging one existing room will enable traffic patterns that can maintain social distancing as people enter/exit and move about during activities; retrofitting spaces to include sanitization stations throughout the facility will decrease the possibility of transmission. Project will have a large impact on local and regional economy; creating 10+ jobs, creating energy efficient facilities that can be used long term, promote healthy lifestyles and positive mental health habits, as well as build interest/opportunity within the region. |
Original sector | Ventilation Systems |
Budget |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Wood Buffalo Water Treatment Plant Expansion
- Coca-Cola Centre
- Children's and Women's Clinical Support Building
- Alberta Schools Alternative Procurement Phase 2
- New Central Library & Library Plaza - LRT Encapsulation
