Village of Vanguard - Upgrading the Distribution of Pumps at the Water Treatment Facility
Completed · Saskatchewan
Source: Infrastructure Canada
The main objective of the project is to upgrade the pumps at the water treatment plant to enable hydrant and water main flushing, and to increase the availability of potable water to our community in times of high water use, and to reduce the likelihood of precautionary water advisories due to equipment breakdowns.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Village of Vanguard - Upgrading the Distribution of Pumps at the Water Treatment Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the project is to upgrade the pumps at the water treatment plant to enable hydrant and water main flushing, and to increase the availability of potable water to our community in times of high water use, and to reduce the likelihood of precautionary water advisories due to equipment breakdowns. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
