Villanueva Solar Farm

Sector: Solar • Location: Mexico

Source: World Bank Group

Project
Active

The project consists of the Villanueva 1 plant, with a capacity of 427 MW, and the 327 MW Villanueva 3 project, which will be built simultaneously. The project is being developed by local subsidiary Enel Green Power Mexico, a unit of the group’s renewable energy arm Enel Green Power through Villanueva Solar SA de CV and Parque Solar Villanueva Tres SA de CV.

The solar project was selected in the

Status
Prospective
Sector
Solar, Car parking, Raw Materials, Power Generation (CCGT), Government, Power Transmission, Automotive, Commercial
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Villanueva Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Villanueva Solar Farm” is an infrastructure initiative in the Solar sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the Villanueva 1 plant, with a capacity of 427 MW, and the 327 MW Villanueva 3 project, which will be built simultaneously. The project is being developed by local subsidiary Enel Green Power Mexico, a unit of the group’s renewable energy arm Enel Green Power through Villanueva Solar SA de CV and Parque Solar Villanueva Tres SA de CV. The solar project was selected in the energy auction held by the Mexican government in 2016. The plant will be located in the state of Coahuila, Viesca. The output generated will be sold under a 15-year PPA with the state utility. The overall 754 MW facility is expected to enter into service in the second half of 2018 and to generate over 1,700 GWh each year, equivalent to the energy consumption needs of over 1.3 million Mexican households, while avoiding the emission of more than 780,000 tonnes of CO2 in the atmosphere. Enel will be investing around $650 million dollars in the construction of Villanueva and is being financed through the Group’s own resources. Construction commenced in March 2017, and considered as financial closure date. Project will be connected to the grid in the second half of 2018. https://www.pv-magazine.com/2017/03/30/enel-breaks-ground-on-754-mw-solar-park-in-mexico/

Original sector

Energy

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Car parking, Raw Materials, Power Generation (CCGT), Government, Power Transmission, Automotive, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project