logo
ProjectActive

Villonaco Wind Power

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Villonaco Wind Power was the special purpose company created to build and operate a 15 MW wind farm in the province of Loja in Ecuador. It was the first project of its kind, and was intended to be a catalyst for future wind projects in Ecuador. Feasibility studies for 45 MW additions to the plant were conducted during 2006. Construction on the project started in 2006.

The contract to construct

Status
Prospective
Sector
Water Supply and Storage, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Ecuador
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Villonaco Wind Power

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Villonaco Wind Power” is an infrastructure initiative in the Water Supply and Storage sector, located in Ecuador. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Villonaco Wind Power was the special purpose company created to build and operate a 15 MW wind farm in the province of Loja in Ecuador. It was the first project of its kind, and was intended to be a catalyst for future wind projects in Ecuador. Feasibility studies for 45 MW additions to the plant were conducted during 2006. Construction on the project started in 2006. The contract to construct and operate the wind farm was signed in August 2006 between Villonaco Wind Power (VWP) and Conelec, the Ecuadorian electricity regulator. VWP received authorization to sell electricity either on the national grid for US $0.093 per kWh for 12 years of its 25 year concession, or sign private contracts. A small part of the energy from the project was intended to power a water treatment plant serving some 400,000 users. Villonaco Wind Power was formed by Canadian alternative energy generator Protocol Energy (80%) and Loja province owned generator Enerloja (20%). Construction works were completed by January 2013. The project cost was estimated at US$26 million. The project was financed by Protocol Energy. A private placement of 1.6 million shares at US$0.413 ($0.50 Canadian dollars) was 50% completed by 2006. This project is likely to have additional investment commitments in the next few years due to planned capacity expansions. "The company aims to sell power to mining companies 'simply because miners are energy hogs. The average mine has operating costs that are 20% energy-related. They all have the same requirements, which is a stable and guaranteed source of energy at a reasonable price, and wind does that,' Logan said." PPI???

Original sector

Energy

Procurement method

Budget

Location

Country

Ecuador

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project