Vilnius District Heating Project
One of 1,650 projects Taiyo tracks in Lithuania.
Source: World Bank Group
The Vilnius District Heating Project aims at reducing the cost of, and at improving the quality of district heating supply, while supporting the commercial viability, and possible privatization pf the Vilnius District Heating Company (VDHC). Project components call for: 1) elimination of most of the remaining block substations, to be replaced by the installation of building-level individual substa
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
- Location
- Lithuania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Vilnius District Heating Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Vilnius District Heating Project aims at reducing the cost of, and at improving the quality of district heating supply, while supporting the commercial viability, and possible privatization pf the Vilnius District Heating Company (VDHC). Project components call for: 1) elimination of most of the remaining block substations, to be replaced by the installation of building-level individual substations, automated to reduce energy consumption, and to convert the system from a supply, to a demand-driven operation model; 2) rehabilitation of heat-only-boilers, by either replacement with new boilers, or new burners and pumps, and, installation of heat exchangers, and related equipment, depending on each case priority, to reduce fuel consumption, operating costs, and emissions; 3) combined heat and power plant rehabilitation, with a new process control, and instrumental system, to improve reliability, and efficiency. Environmentally friendly low-Nox burner units, should be adjusted for both mazut, and gas firing to reduce emissions, and an additional feed water pump unit should improve plant reliability. Hydraulic and lubrication systems for the turbo-generator will improve reliability, and control, while frequency controlled district heating pumps would adjust the plant demand-driven variable water flow operation mode, and, a regenerative air pre-heater would improve efficiency; and, 4) technical assistance to improve management information systems, covering accounting procedures, financial management, and customer databases to enable prompt processing, and managerial information to enhance cost control, and monitoring. Project management will assist with procurement, supervision, and management. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Lithuania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Lithuania
- Klaipeda Combined Heat and Power Plant
- ENVIRONMENT AND MUNICIPALITIES
- VILNIUS URBAN INFRASTRUCTURE
- EU FUNDS CO-FINANCING 2007-2013 (LT)
- ENV./PANEVEZYS WATER & WASTE WATER PR.
- VILNIUS WATER AND SANITATION
- Iberdrola Combined Cycle Power Plant Project Lithuania
- East West Transport Corriodor II - a green corridor concept within the Northern Transport Axis approach
