logo
ProjectClosed

Vilnius District Heating Project

One of 1,650 projects Taiyo tracks in Lithuania.

Source: World Bank Group

The Vilnius District Heating Project aims at reducing the cost of, and at improving the quality of district heating supply, while supporting the commercial viability, and possible privatization pf the Vilnius District Heating Company (VDHC). Project components call for: 1) elimination of most of the remaining block substations, to be replaced by the installation of building-level individual substa

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
Location
Lithuania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vilnius District Heating Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vilnius District Heating Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Lithuania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Vilnius District Heating Project aims at reducing the cost of, and at improving the quality of district heating supply, while supporting the commercial viability, and possible privatization pf the Vilnius District Heating Company (VDHC). Project components call for: 1) elimination of most of the remaining block substations, to be replaced by the installation of building-level individual substations, automated to reduce energy consumption, and to convert the system from a supply, to a demand-driven operation model; 2) rehabilitation of heat-only-boilers, by either replacement with new boilers, or new burners and pumps, and, installation of heat exchangers, and related equipment, depending on each case priority, to reduce fuel consumption, operating costs, and emissions; 3) combined heat and power plant rehabilitation, with a new process control, and instrumental system, to improve reliability, and efficiency. Environmentally friendly low-Nox burner units, should be adjusted for both mazut, and gas firing to reduce emissions, and an additional feed water pump unit should improve plant reliability. Hydraulic and lubrication systems for the turbo-generator will improve reliability, and control, while frequency controlled district heating pumps would adjust the plant demand-driven variable water flow operation mode, and, a regenerative air pre-heater would improve efficiency; and, 4) technical assistance to improve management information systems, covering accounting procedures, financial management, and customer databases to enable prompt processing, and managerial information to enhance cost control, and monitoring. Project management will assist with procurement, supervision, and management.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Lithuania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project