logo

Vilnius District Heating Project

Sector: Water Supply and Storage • Location: Lithuania

Source: World Bank Group

Project
Closed

The Vilnius District Heating Project aims at reducing the cost of, and at improving the quality of district heating supply, while supporting the commercial viability, and possible privatization pf the Vilnius District Heating Company (VDHC). Project components call for: 1) elimination of most of the remaining block substations, to be replaced by the installation of building-level individual substa

Project Information FAQ

Project Information

5 Q
The project “Vilnius District Heating Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Lithuania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Vilnius District Heating Project aims at reducing the cost of, and at improving the quality of district heating supply, while supporting the commercial viability, and possible privatization pf the Vilnius District Heating Company (VDHC). Project components call for: 1) elimination of most of the remaining block substations, to be replaced by the installation of building-level individual substations, automated to reduce energy consumption, and to convert the system from a supply, to a demand-driven operation model; 2) rehabilitation of heat-only-boilers, by either replacement with new boilers, or new burners and pumps, and, installation of heat exchangers, and related equipment, depending on each case priority, to reduce fuel consumption, operating costs, and emissions; 3) combined heat and power plant rehabilitation, with a new process control, and instrumental system, to improve reliability, and efficiency. Environmentally friendly low-Nox burner units, should be adjusted for both mazut, and gas firing to reduce emissions, and an additional feed water pump unit should improve plant reliability. Hydraulic and lubrication systems for the turbo-generator will improve reliability, and control, while frequency controlled district heating pumps would adjust the plant demand-driven variable water flow operation mode, and, a regenerative air pre-heater would improve efficiency; and, 4) technical assistance to improve management information systems, covering accounting procedures, financial management, and customer databases to enable prompt processing, and managerial information to enhance cost control, and monitoring. Project management will assist with procurement, supervision, and management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data