Vinacomin Dong Nai V HPP
Sector: Hydro • Location: Vietnam
Source: World Bank Group
Vinacomin - Power Holding Corporation Limited, a private entity, was planning the development of the 150 MW Dong Nai 5 Hydropower Plant, Dong Nai river, Dak Sin commune, Dak R'Lap district, Dak Nong province and in Loc Bac commune, Bao Lam district, Lam Dong province. The project was expected to generate 604.430 GWh annually, to be supplied to the national grid via a new construction transmission
- Status
- Prospective
- Sector
- Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Vinacomin Dong Nai V HPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vinacomin - Power Holding Corporation Limited, a private entity, was planning the development of the 150 MW Dong Nai 5 Hydropower Plant, Dong Nai river, Dak Sin commune, Dak R'Lap district, Dak Nong province and in Loc Bac commune, Bao Lam district, Lam Dong province. The project was expected to generate 604.430 GWh annually, to be supplied to the national grid via a new construction transmission line. the project was to consist of two Francis turbines of 77.32MW each and 2 Synchronous 3 phases generators of 75MW each. Lifespan was 30 years. Commissioning was expected for 2015. Construction was expected to last 4 years. Electricity price was estimated at VND 730 per kWh ($0.035 per kWh). The feasibility was finalized in September 2007 (140MW). The investment certifciate was issued in September 2007. In June 2009, the feasbility study for the 150MW variant was completed. The EIA was approved in June 2009. The first construction contract was signed in January 2011. Total investment was estimated at VND 3,365,406 million ($161.6 million). Financial closure date was unknown, the FC was estimated as December 2011, after 25% of construction had been completed according to 2015 commissioning date. The project applied for UNFCCC/CDM financing. http://cdm.unfccc.int/filestorage/U/K/G/UKGZETHLQ9FSMI81DOYNBR3PA7V5J0/Untitled%20%28uploaded%2024%20May%2011%2004%3A39%3A15%29.pdf?t=VW58bTI3dXdvfDAXB7VRDKDBUIBtYBkgj4E2 Sponsor needs to be added. |
Original sector | Energy |
Budget |
Location
Country | Vietnam |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project