Vinacomin Dong Nai V HPP

Sector: Hydro • Location: Vietnam

Source: World Bank Group

Project
Active

Vinacomin - Power Holding Corporation Limited, a private entity, was planning the development of the 150 MW Dong Nai 5 Hydropower Plant, Dong Nai river, Dak Sin commune, Dak R'Lap district, Dak Nong province and in Loc Bac commune, Bao Lam district, Lam Dong province. The project was expected to generate 604.430 GWh annually, to be supplied to the national grid via a new construction transmission

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vinacomin Dong Nai V HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vinacomin Dong Nai V HPP” is an infrastructure initiative in the Hydro sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vinacomin - Power Holding Corporation Limited, a private entity, was planning the development of the 150 MW Dong Nai 5 Hydropower Plant, Dong Nai river, Dak Sin commune, Dak R'Lap district, Dak Nong province and in Loc Bac commune, Bao Lam district, Lam Dong province. The project was expected to generate 604.430 GWh annually, to be supplied to the national grid via a new construction transmission line. the project was to consist of two Francis turbines of 77.32MW each and 2 Synchronous 3 phases generators of 75MW each. Lifespan was 30 years. Commissioning was expected for 2015. Construction was expected to last 4 years. Electricity price was estimated at VND 730 per kWh ($0.035 per kWh). The feasibility was finalized in September 2007 (140MW). The investment certifciate was issued in September 2007. In June 2009, the feasbility study for the 150MW variant was completed. The EIA was approved in June 2009. The first construction contract was signed in January 2011. Total investment was estimated at VND 3,365,406 million ($161.6 million). Financial closure date was unknown, the FC was estimated as December 2011, after 25% of construction had been completed according to 2015 commissioning date. The project applied for UNFCCC/CDM financing. http://cdm.unfccc.int/filestorage/U/K/G/UKGZETHLQ9FSMI81DOYNBR3PA7V5J0/Untitled%20%28uploaded%2024%20May%2011%2004%3A39%3A15%29.pdf?t=VW58bTI3dXdvfDAXB7VRDKDBUIBtYBkgj4E2 Sponsor needs to be added.

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project