logo
ProjectPlanned

Vincent Thomas Bridge Finger Joint Repairs

Sector: Road • Location: San Pedro, California, United States

Source: Daily Breeze

Nighttime lane closures on the Vincent Thomas Bridge from August 27 to 29, 2025, to perform repairs on the bridge's finger joints, which are expansion joints that accommodate bridge deck movement due to temperature changes.

Status
Prospective
Sector
Road, Bridge, Government
Location
San Pedro, California, United States of America
Updated
19 Nov 2026
Source
Daily Breeze

ConstructChat

Ask ConstructChat about Vincent Thomas Bridge Finger Joint Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vincent Thomas Bridge Finger Joint Repairs” is an infrastructure initiative in the Road sector, located in San Pedro, California, United States. Taiyo aggregates data on it from Daily Breeze.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Nighttime lane closures on the Vincent Thomas Bridge from August 27 to 29, 2025, to perform repairs on the bridge's finger joints, which are expansion joints that accommodate bridge deck movement due to temperature changes.

Original sector

Transportation

Location

Country

United States of America (USA)

State

California

City

San Pedro

Source

Source

Daily Breeze

URL

More Details

Record type

Project

Sector

Road, Bridge, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project